Our team last week installed a repointing test panel on a project in St. Louis. Being the first week of December in the Midwest we knew we were taking a chance with the weather. Question: Are we going to have enough time for the mortar to cure before frost set in? We prepared for winter protection and had the wall and working area at 75F during the installation of the hydraulic lime mortar and left the temperature at that level for five hours after installation.

If you have not seen a frozen surface of a newly installed mortar joint well now you have! As it turns out the weather was below freezing for the critical 4 days after our installation and thus the surface of the mortar froze. I have only received images at this point on the condition so my involvement is somewhat limited as to the severity of the problem. The solution to fix frost bitten mortar is to reinstall the material if the damage is justifiably deep and out of the specification requirement for the joint profile finish. We do have an open stipple finish profile which may come to our rescue, but we must be certain the bond between the mortar and stone has not been jeopardized in any way.

Frost damage on a newly repointed wall with hydraulic lime mortar

, , , ,

6 Comments

%d bloggers like this: